Iron-On Patch Sourcing Program for Hospitals and Clinics: Scarves
Iron-On Patch Programme for Hospitals and Clinics: Scarves
This programme covers the full path from a iron-on patch requirement to a repeatable bulk supply for hospitals and clinics. Instead of buying whatever a catalogue happens to stock, you specify the base material, the 10# Gauge, the finish and the packing, and we hold that specification so every reorder matches the last one. It is built around scarves, which is where most of the specification detail sits.
The most common failure in iron-on patch sourcing is not price — it is drift. A base material changes mill, the shade moves, a plating bath changes and the item quietly stops matching the approved sample. We prevent that with a written spec, an approved counter sample and a golden sample retained at the factory.

What the programme covers
- Specification build from your tech pack or a physical reference sample
- Base material and finish options with costed alternatives
- Sampling, testing and approval against OEKO-TEX Standard 100
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
Recommended specifications
- Acrylic — selected for colour depth and finish stability
- PU Leather — selected for colour depth and finish stability
- Recycled PET — selected for colour depth and finish stability
- Aluminium — chosen when the item has to survive repeated laundering

Programme parameters
| Item | Iron-On Patch |
|---|---|
| Target sector | Hospitals and Clinics |
| Target application | Scarves |
| Standard size | 10# Gauge |
| Finish options | Piece-Dyed Finish, Pearlescent Coating, Nickel-Free Electroplating |
| Processes | Singeing, Injection Moulding, Epoxy Coating |
| MOQ | 500 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Bulk lead time | 25-30 days |
| Compliance | OEKO-TEX Standard 100 |
| Delivery terms | EXW / FOB / CIF / DDP |
Why buyers choose this route
- Costed alternatives shown at quotation so the trade-off is visible
- Plating and dyeing sub-processes planned into the quoted lead time
- Consolidated shipping with documented carton ratios
- AQL inspection on every bulk lot with photo reporting before balance payment
- Compliance documentation issued with the shipment, not after it
How the programme runs
- Discovery call: quantity, target price, delivery window and compliance needs
- Material and finish proposal with costed alternatives
- Counter sample built from your tech pack or reference sample
- Approval, testing and pre-production sign-off
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
FAQ
Which compliance documents do you provide?
OEKO-TEX Standard 100 documentation is issued with the shipment. Test reports can be ordered against any additional standard you nominate.
Can you match a physical sample?
Yes. Send the reference and we reverse engineer the specification, then produce a counter sample for approval before any bulk commitment.
What is the minimum order quantity?
Standard MOQ is 500 per style per colour. Mixed colourways can be combined on the same spec if the base material is identical.
How long does sampling take?
14 working days for the first sample, with 5 days per revision round. Plated or dyed-to-match items add a few days.
Tell us the item, the quantity and the delivery window. We will quote it with the sub-processes named, so the lead time you approve is the lead time you get.



