UV Protection Fabric Sourcing Program for Denim Mills: Underwear
UV Protection Fabric Programme for Denim Mills: Underwear
This programme covers the full path from a uv protection fabric requirement to a repeatable bulk supply for denim mills. Instead of buying whatever a catalogue happens to stock, you specify the base material, the 80 gsm, the finish and the packing, and we hold that specification so every reorder matches the last one. It is built around underwear, which is where most of the specification detail sits.
The most common failure in uv protection fabric sourcing is not price — it is drift. A base material changes mill, the shade moves, a plating bath changes and the item quietly stops matching the approved sample. We prevent that with a written spec, an approved counter sample and a golden sample retained at the factory.

What the programme covers
- Specification build from your tech pack or a physical reference sample
- Base material and finish options with costed alternatives
- Sampling, testing and approval against Sedex SMETA
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
Recommended specifications
- Copper — used when strength and abrasion resistance come first
- Cotton — chosen when the item has to survive repeated laundering
- Acrylic — chosen when the item has to survive repeated laundering
- Bamboo — selected for colour depth and finish stability

Programme parameters
| Item | UV Protection Fabric |
|---|---|
| Target sector | Denim Mills |
| Target application | Underwear |
| Standard size | 80 gsm |
| Finish options | Chrome Plating, Sandblasted Finish, Yarn-Dyed Finish |
| Processes | Weft Knitting, Laminating, Brushing |
| MOQ | 3,000 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Bulk lead time | 25-55 days |
| Compliance | Sedex SMETA |
| Delivery terms | EXW / FOB / CIF / DDP |
Why buyers choose this route
- AQL inspection on every bulk lot with photo reporting before balance payment
- MOQ quoted per style per colourway, stated before sampling starts
- Written specification held on file, so every reorder reproduces the approved sample
- One accountable owner from sampling through to ex-factory
- Golden sample retained at the factory and a second one held by the buyer
How the programme runs
- Discovery call: quantity, target price, delivery window and compliance needs
- Material and finish proposal with costed alternatives
- Counter sample built from your tech pack or reference sample
- Approval, testing and pre-production sign-off
- Bulk production with in-line inspection and photo reporting
- Packing, documentation and shipment under the agreed Incoterm
FAQ
Can you match a physical sample?
Yes. Send the reference and we reverse engineer the specification, then produce a counter sample for approval before any bulk commitment.
Can you handle our own artwork or tooling?
Yes. Artwork files or existing tooling can be used; we confirm tolerances in writing before the first production run.
How long does sampling take?
14 working days for the first sample, with 3 days per revision round. Plated or dyed-to-match items add a few days.
What are the payment and delivery terms?
Standard terms are a deposit with the order and the balance before shipment, under EXW / FOB / CIF / DDP as agreed.
Send the reference sample or tech pack and we will come back with a costed specification, a sampling timetable and the compliance documents your market requires.



