Nylon Spandex Fabric with Sandblasted Finish for Yoga Wear
This nylon spandex fabric is supplied to a written specification so that reorders match the approved sample. The fabric construction is fixed at quotation stage — base material, the sandblasted finish surface, the 180 gsm and the packing — and held on file, which is what keeps yoga wear consistent across seasons instead of drifting with whatever the mill happens to have in stock.
The usual reason buyers come to us is not price. It is a spec that lived in an email instead of a tech pack, or reorders that quietly changed supplier and changed the hand feel. Both are preventable once the specification is written down before bulk starts.

Specification
| Product | Nylon Spandex Fabric |
|---|---|
| Finish / process | Sandblasted Finish |
| Typical application | Yoga Wear |
| Base material | Wool |
| Standard size | 180 gsm |
| Colour matching | 12 Pantone or lab-dip matched shades |
| MOQ | 1,000 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Bulk lead time | 20-55 days after approval |
| Compliance | Sedex SMETA |
Material and finish options
- Silicone — preferred when weight matters more than rigidity
- Brass — used when the finish has to hold a plating or coating
- Nickel Silver — preferred when weight matters more than rigidity
- Polyester — chosen where strength and wear resistance come first
- Stainless Steel — the cost-effective default for volume programmes
Processes available on this item
- Bonding
- Rotary Printing
- Garment Washing
- UV Protection Finishing
- Embroidery
- Anti-Static Finishing

Where it is used
The specification above is the one most often ordered for Yoga Wear. Related applications on the same base include upholstery, bras, boots, caps, jeans.
Quality and packing
- In-line inspection with AQL 4.0 sampling on every lot.
- Photo report shared before the balance payment is due.
- Packed to your own carton ratio and barcode specification.
- Test reports issued against Sedex SMETA with the shipment.
- Golden sample retained at the factory, second one held by the buyer.
FAQ
Can you handle our own artwork or tooling?
Yes. Artwork files or existing tooling can be used; we confirm tolerances in writing before the first production run.
What happens if a bulk lot fails inspection?
The lot is reworked or remade at our cost. Inspection reports are shared before the balance payment is due.
Can you match a physical sample?
Yes. Send the reference and we reverse engineer the specification, then produce a counter sample for approval before any bulk commitment.
How long does sampling take?
14 working days for the first sample, with 5 days per revision round. Plated or dyed-to-match items add a few days.
Share the programme details and we will propose two alternatives — one optimised for unit cost, one for lead time — and let you choose.




