Piping Cord with Silicone Wash Finish for Bedding Sets
This piping cord is supplied to a written specification so that reorders match the approved sample. The product spec is fixed at quotation stage — base material, the silicone wash finish surface, the 3# Gauge and the packing — and held on file, which is what keeps bedding sets consistent across seasons instead of drifting with whatever the mill happens to have in stock.
The usual reason buyers come to us is not price. It is shade drift between the approved lab dip and the bulk lot, or a zipper puller that broke under pull test at the warehouse. Both are preventable once the specification is written down before bulk starts.

Specification
| Product | Piping Cord |
|---|---|
| Finish / process | Silicone Wash Finish |
| Typical application | Bedding Sets |
| Base material | Bamboo |
| Standard size | 3# Gauge |
| Colour matching | 12 Pantone or lab-dip matched shades |
| MOQ | 5,000 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Bulk lead time | 25-30 days after approval |
| Compliance | BSCI |
Material and finish options
- Nickel Silver — chosen where strength and wear resistance come first
- Rubber — chosen where strength and wear resistance come first
- Polyester — selected when the item is in skin contact and needs to test clean
- Wood — used when the finish has to hold a plating or coating
- Aluminium — chosen where strength and wear resistance come first
Processes available on this item
- Die Casting
- Embroidery
- Heat Setting
- Sublimation Printing
- Calendering
- Singeing

Where it is used
The specification above is the one most often ordered for Bedding Sets. Related applications on the same base include shirts, bags, footwear, skirts, dresses.
Quality and packing
- In-line inspection with AQL 1.5 sampling on every lot.
- Photo report shared before the balance payment is due.
- Packed to your own carton ratio and barcode specification.
- Test reports issued against BSCI with the shipment.
- Golden sample retained at the factory, second one held by the buyer.
FAQ
Can you handle our own artwork or tooling?
Yes. Artwork files or existing tooling can be used; we confirm tolerances in writing before the first production run.
What are the payment and delivery terms?
Standard terms are a deposit with the order and the balance before shipment, under EXW / FOB / CIF / DDP as agreed.
Do you hold stock for reorders?
Approved specifications are kept on file and, for repeat programmes, base material can be reserved against a rolling forecast.
How long does sampling take?
7 working days for the first sample, with 5 days per revision round. Plated or dyed-to-match items add a few days.
Share the programme details and we will propose two alternatives — one optimised for unit cost, one for lead time — and let you choose.




