Barcode Sticker with Antique Copper Finish for Jeans
This barcode sticker is supplied to a written specification so that reorders match the approved sample. The product spec is fixed at quotation stage — base material, the antique copper finish surface, the 3# Gauge and the packing — and held on file, which is what keeps jeans consistent across seasons instead of drifting with whatever the mill happens to have in stock.
The usual reason buyers come to us is not price. It is a trim that passed sampling but failed in-line because it was never cycle tested, or shade drift between the approved lab dip and the bulk lot. Both are preventable once the specification is written down before bulk starts.

Specification
| Product | Barcode Sticker |
|---|---|
| Finish / process | Antique Copper Finish |
| Typical application | Jeans |
| Base material | Nickel Silver |
| Standard size | 3# Gauge |
| Colour matching | 24 Pantone or lab-dip matched shades |
| MOQ | 1,000 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Bulk lead time | 20-40 days after approval |
| Compliance | Sedex SMETA |
Material and finish options
- Cotton — preferred when weight matters more than rigidity
- Genuine Leather — selected when the item is in skin contact and needs to test clean
- Acrylic — preferred when weight matters more than rigidity
- POM Plastic — the cost-effective default for volume programmes
- TPU — selected when the item is in skin contact and needs to test clean
Processes available on this item
- Brushing
- Mercerising
- Die Casting
- Weft Knitting
- Embroidery
- Stone Washing

Where it is used
The specification above is the one most often ordered for Jeans. Related applications on the same base include footwear, scarves, sleepwear, hats, backpacks.
Quality and packing
- In-line inspection with AQL 1.5 sampling on every lot.
- Photo report shared before the balance payment is due.
- Packed to your own carton ratio and barcode specification.
- Test reports issued against Sedex SMETA with the shipment.
- Golden sample retained at the factory, second one held by the buyer.
FAQ
How long does sampling take?
10 working days for the first sample, with 3 days per revision round. Plated or dyed-to-match items add a few days.
What happens if a bulk lot fails inspection?
The lot is reworked or remade at our cost. Inspection reports are shared before the balance payment is due.
Do you hold stock for reorders?
Approved specifications are kept on file and, for repeat programmes, base material can be reserved against a rolling forecast.
Which compliance documents do you provide?
Sedex SMETA documentation is issued with the shipment. Test reports can be ordered against any additional standard you nominate.
Share the programme details and we will propose two alternatives — one optimised for unit cost, one for lead time — and let you choose.



