Tulle Fabric with Sandblasted Finish for Activewear
This tulle fabric is supplied to a written specification so that reorders match the approved sample. The fabric construction is fixed at quotation stage — base material, the sandblasted finish surface, the 400 gsm and the packing — and held on file, which is what keeps activewear consistent across seasons instead of drifting with whatever the mill happens to have in stock.
The usual reason buyers come to us is not price. It is an interlining that bubbled after the first press, or elastic that lost recovery after three washes. Both are preventable once the specification is written down before bulk starts.

Specification
| Product | Tulle Fabric |
|---|---|
| Finish / process | Sandblasted Finish |
| Typical application | Activewear |
| Base material | Bamboo |
| Standard size | 400 gsm |
| Colour matching | 24 Pantone or lab-dip matched shades |
| MOQ | 1,000 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Bulk lead time | 25-55 days after approval |
| Compliance | OEKO-TEX Standard 100 |
Material and finish options
- Wood — preferred when weight matters more than rigidity
- Recycled PET — chosen where strength and wear resistance come first
- Neoprene — chosen where strength and wear resistance come first
- PU Leather — chosen where strength and wear resistance come first
- Iron — selected when the item is in skin contact and needs to test clean
Processes available on this item
- Weft Knitting
- Calendering
- Heat Transfer Printing
- Injection Moulding
- Anti-Pilling Finish
- Ultrasonic Welding

Where it is used
The specification above is the one most often ordered for Activewear. Related applications on the same base include activewear, upholstery, workwear, suits, skirts.
Quality and packing
- In-line inspection with AQL 4.0 sampling on every lot.
- Photo report shared before the balance payment is due.
- Packed to your own carton ratio and barcode specification.
- Test reports issued against OEKO-TEX Standard 100 with the shipment.
- Golden sample retained at the factory, second one held by the buyer.
FAQ
What happens if a bulk lot fails inspection?
The lot is reworked or remade at our cost. Inspection reports are shared before the balance payment is due.
How long does sampling take?
10 working days for the first sample, with 3 days per revision round. Plated or dyed-to-match items add a few days.
Which compliance documents do you provide?
OEKO-TEX Standard 100 documentation is issued with the shipment. Test reports can be ordered against any additional standard you nominate.
Can you match a physical sample?
Yes. Send the reference and we reverse engineer the specification, then produce a counter sample for approval before any bulk commitment.
Send the reference sample or tech pack and we will come back with a costed specification, a sampling timetable and the compliance documents your market requires.




