Wired Edge Ribbon with Silicone Wash Finish for Down Jackets
This wired edge ribbon is supplied to a written specification so that reorders match the approved sample. The product spec is fixed at quotation stage — base material, the silicone wash finish surface, the 6 mm Width and the packing — and held on file, which is what keeps down jackets consistent across seasons instead of drifting with whatever the mill happens to have in stock.
The usual reason buyers come to us is not price. It is reorders that quietly changed supplier and changed the hand feel, or elastic that lost recovery after three washes. Both are preventable once the specification is written down before bulk starts.

Specification
| Product | Wired Edge Ribbon |
|---|---|
| Finish / process | Silicone Wash Finish |
| Typical application | Down Jackets |
| Base material | Wood |
| Standard size | 6 mm Width |
| Colour matching | 16 Pantone or lab-dip matched shades |
| MOQ | 5,000 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Bulk lead time | 20-30 days after approval |
| Compliance | ISO 14001 |
Material and finish options
- Stainless Steel — preferred when weight matters more than rigidity
- ABS Resin — selected when the item is in skin contact and needs to test clean
- Rubber — chosen where strength and wear resistance come first
- Recycled PET — chosen where strength and wear resistance come first
- Acrylic — preferred when weight matters more than rigidity
Processes available on this item
- Weft Knitting
- Mercerising
- Metal Stamping
- Anti-Bacterial Finishing
- Flame Retardant Finishing
- Bonding

Where it is used
The specification above is the one most often ordered for Down Jackets. Related applications on the same base include yoga wear, bridal gowns, swimwear, kidswear, caps.
Quality and packing
- In-line inspection with AQL 1.5 sampling on every lot.
- Photo report shared before the balance payment is due.
- Packed to your own carton ratio and barcode specification.
- Test reports issued against ISO 14001 with the shipment.
- Golden sample retained at the factory, second one held by the buyer.
FAQ
How long does sampling take?
14 working days for the first sample, with 5 days per revision round. Plated or dyed-to-match items add a few days.
Can you handle our own artwork or tooling?
Yes. Artwork files or existing tooling can be used; we confirm tolerances in writing before the first production run.
Which compliance documents do you provide?
ISO 14001 documentation is issued with the shipment. Test reports can be ordered against any additional standard you nominate.
Do you hold stock for reorders?
Approved specifications are kept on file and, for repeat programmes, base material can be reserved against a rolling forecast.
Tell us the item, the quantity and the delivery window. We will quote it with the sub-processes named, so the lead time you approve is the lead time you get.




