Toggle Button with Brushed Silver Finish for Hats
This toggle button is supplied to a written specification so that reorders match the approved sample. The product spec is fixed at quotation stage — base material, the brushed silver finish surface, the 50 mm Width and the packing — and held on file, which is what keeps hats consistent across seasons instead of drifting with whatever the mill happens to have in stock.
The usual reason buyers come to us is not price. It is shrinkage that only showed up after the first wash, or a trim that passed sampling but failed in-line because it was never cycle tested. Both are preventable once the specification is written down before bulk starts.

Specification
| Product | Toggle Button |
|---|---|
| Finish / process | Brushed Silver Finish |
| Typical application | Hats |
| Base material | Copper |
| Standard size | 50 mm Width |
| Colour matching | 12 Pantone or lab-dip matched shades |
| MOQ | 500 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Bulk lead time | 20-30 days after approval |
| Compliance | GRS |
Material and finish options
- Silicone — the cost-effective default for volume programmes
- Iron — used when the finish has to hold a plating or coating
- POM Plastic — used when the finish has to hold a plating or coating
- Neoprene — selected when the item is in skin contact and needs to test clean
- Brass — chosen where strength and wear resistance come first
Processes available on this item
- Sanforising
- Calendering
- Piece Dyeing
- Ultrasonic Welding
- Injection Moulding
- Screen Printing

Where it is used
The specification above is the one most often ordered for Hats. Related applications on the same base include bras, evening wear, activewear, home curtains, jeans.
Quality and packing
- In-line inspection with AQL 2.5 sampling on every lot.
- Photo report shared before the balance payment is due.
- Packed to your own carton ratio and barcode specification.
- Test reports issued against GRS with the shipment.
- Golden sample retained at the factory, second one held by the buyer.
FAQ
What happens if a bulk lot fails inspection?
The lot is reworked or remade at our cost. Inspection reports are shared before the balance payment is due.
What are the payment and delivery terms?
Standard terms are a deposit with the order and the balance before shipment, under EXW / FOB / CIF / DDP as agreed.
Can you handle our own artwork or tooling?
Yes. Artwork files or existing tooling can be used; we confirm tolerances in writing before the first production run.
Which compliance documents do you provide?
GRS documentation is issued with the shipment. Test reports can be ordered against any additional standard you nominate.
Share the programme details and we will propose two alternatives — one optimised for unit cost, one for lead time — and let you choose.



