Knitted Elastic with Chrome Plating for Bedding Sets
This knitted elastic is supplied to a written specification so that reorders match the approved sample. The product spec is fixed at quotation stage — base material, the chrome plating surface, the 20 mm Width and the packing — and held on file, which is what keeps bedding sets consistent across seasons instead of drifting with whatever the mill happens to have in stock.
The usual reason buyers come to us is not price. It is a compliance document that arrived after the goods were already shipped, or lead time quoted without the plating or dyeing sub-process. Both are preventable once the specification is written down before bulk starts.

Specification
| Product | Knitted Elastic |
|---|---|
| Finish / process | Chrome Plating |
| Typical application | Bedding Sets |
| Base material | Nickel Silver |
| Standard size | 20 mm Width |
| Colour matching | 24 Pantone or lab-dip matched shades |
| MOQ | 500 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Bulk lead time | 25-55 days after approval |
| Compliance | GB 18401 |
Material and finish options
- Zinc Alloy — selected when the item is in skin contact and needs to test clean
- TPU — preferred when weight matters more than rigidity
- Recycled PET — chosen where strength and wear resistance come first
- PU Leather — the cost-effective default for volume programmes
- Genuine Leather — chosen where strength and wear resistance come first
Processes available on this item
- Laser Cutting
- Sanforising
- Embossing
- Anti-Pilling Finish
- Brushing
- Piece Dyeing

Where it is used
The specification above is the one most often ordered for Bedding Sets. Related applications on the same base include gloves, workwear, boots, baby clothing, socks.
Quality and packing
- In-line inspection with AQL 1.5 sampling on every lot.
- Photo report shared before the balance payment is due.
- Packed to your own carton ratio and barcode specification.
- Test reports issued against GB 18401 with the shipment.
- Golden sample retained at the factory, second one held by the buyer.
FAQ
How long does sampling take?
10 working days for the first sample, with 3 days per revision round. Plated or dyed-to-match items add a few days.
Can you handle our own artwork or tooling?
Yes. Artwork files or existing tooling can be used; we confirm tolerances in writing before the first production run.
What are the payment and delivery terms?
Standard terms are a deposit with the order and the balance before shipment, under EXW / FOB / CIF / DDP as agreed.
Can you match a physical sample?
Yes. Send the reference and we reverse engineer the specification, then produce a counter sample for approval before any bulk commitment.
Share the programme details and we will propose two alternatives — one optimised for unit cost, one for lead time — and let you choose.




