Rayon Fabric with Soft-Touch Rubber Coating for Coats
This rayon fabric is supplied to a written specification so that reorders match the approved sample. The fabric construction is fixed at quotation stage — base material, the soft-touch rubber coating surface, the 240 gsm and the packing — and held on file, which is what keeps coats consistent across seasons instead of drifting with whatever the mill happens to have in stock.
The usual reason buyers come to us is not price. It is an interlining that bubbled after the first press, or shade drift between the approved lab dip and the bulk lot. Both are preventable once the specification is written down before bulk starts.

Specification
| Product | Rayon Fabric |
|---|---|
| Finish / process | Soft-Touch Rubber Coating |
| Typical application | Coats |
| Base material | Tencel Lyocell |
| Standard size | 240 gsm |
| Colour matching | 8 Pantone or lab-dip matched shades |
| MOQ | 3,000 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Bulk lead time | 15-40 days after approval |
| Compliance | EN 71-3 |
Material and finish options
- Rubber — preferred when weight matters more than rigidity
- Ceramic — chosen where strength and wear resistance come first
- Recycled PET — used when the finish has to hold a plating or coating
- PU Leather — used when the finish has to hold a plating or coating
- Acrylic — chosen where strength and wear resistance come first
Processes available on this item
- Stone Washing
- PU Coating
- Weft Knitting
- Laminating
- Digital Printing
- Anti-Bacterial Finishing

Where it is used
The specification above is the one most often ordered for Coats. Related applications on the same base include kidswear, trousers, blazers, skirts, yoga wear.
Quality and packing
- In-line inspection with AQL 4.0 sampling on every lot.
- Photo report shared before the balance payment is due.
- Packed to your own carton ratio and barcode specification.
- Test reports issued against EN 71-3 with the shipment.
- Golden sample retained at the factory, second one held by the buyer.
FAQ
Do you hold stock for reorders?
Approved specifications are kept on file and, for repeat programmes, base material can be reserved against a rolling forecast.
What happens if a bulk lot fails inspection?
The lot is reworked or remade at our cost. Inspection reports are shared before the balance payment is due.
What are the payment and delivery terms?
Standard terms are a deposit with the order and the balance before shipment, under EXW / FOB / CIF / DDP as agreed.
How long does sampling take?
7 working days for the first sample, with 5 days per revision round. Plated or dyed-to-match items add a few days.
Share the programme details and we will propose two alternatives — one optimised for unit cost, one for lead time — and let you choose.




