Chain Trim with Enzyme Wash Finish for Hats
This chain trim is supplied to a written specification so that reorders match the approved sample. The product spec is fixed at quotation stage — base material, the enzyme wash finish surface, the 6 mm Width and the packing — and held on file, which is what keeps hats consistent across seasons instead of drifting with whatever the mill happens to have in stock.
The usual reason buyers come to us is not price. It is an interlining that bubbled after the first press, or an interlining that bubbled after the first press. Both are preventable once the specification is written down before bulk starts.

Specification
| Product | Chain Trim |
|---|---|
| Finish / process | Enzyme Wash Finish |
| Typical application | Hats |
| Base material | Recycled PET |
| Standard size | 6 mm Width |
| Colour matching | 6 Pantone or lab-dip matched shades |
| MOQ | 2,000 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Bulk lead time | 25-30 days after approval |
| Compliance | WRAP |
Material and finish options
- Wood — used when the finish has to hold a plating or coating
- Zinc Alloy — the cost-effective default for volume programmes
- Polyester — preferred when weight matters more than rigidity
- Neoprene — used when the finish has to hold a plating or coating
- Copper — preferred when weight matters more than rigidity
Processes available on this item
- Rotary Printing
- Anti-Pilling Finish
- Digital Printing
- Yarn Dyeing
- Water Repellent Finishing
- Laser Cutting

Where it is used
The specification above is the one most often ordered for Hats. Related applications on the same base include dresses, underwear, outdoor tents, down jackets, backpacks.
Quality and packing
- In-line inspection with AQL 1.5 sampling on every lot.
- Photo report shared before the balance payment is due.
- Packed to your own carton ratio and barcode specification.
- Test reports issued against WRAP with the shipment.
- Golden sample retained at the factory, second one held by the buyer.
FAQ
Which compliance documents do you provide?
WRAP documentation is issued with the shipment. Test reports can be ordered against any additional standard you nominate.
What happens if a bulk lot fails inspection?
The lot is reworked or remade at our cost. Inspection reports are shared before the balance payment is due.
What are the payment and delivery terms?
Standard terms are a deposit with the order and the balance before shipment, under EXW / FOB / CIF / DDP as agreed.
Do you hold stock for reorders?
Approved specifications are kept on file and, for repeat programmes, base material can be reserved against a rolling forecast.
Send the reference sample or tech pack and we will come back with a costed specification, a sampling timetable and the compliance documents your market requires.




