Microfiber Fabric with Yarn-Dyed Finish for Shirts
This microfiber fabric is supplied to a written specification so that reorders match the approved sample. The fabric construction is fixed at quotation stage — base material, the yarn-dyed finish surface, the 210 gsm and the packing — and held on file, which is what keeps shirts consistent across seasons instead of drifting with whatever the mill happens to have in stock.
The usual reason buyers come to us is not price. It is lead time quoted without the plating or dyeing sub-process, or cartons packed to the factory ratio instead of the buyer's size ratio. Both are preventable once the specification is written down before bulk starts.

Specification
| Product | Microfiber Fabric |
|---|---|
| Finish / process | Yarn-Dyed Finish |
| Typical application | Shirts |
| Base material | Viscose |
| Standard size | 210 gsm |
| Colour matching | 6 Pantone or lab-dip matched shades |
| MOQ | 5,000 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Bulk lead time | 25-30 days after approval |
| Compliance | California Prop 65 |
Material and finish options
- TPU — preferred when weight matters more than rigidity
- Nickel Silver — chosen where strength and wear resistance come first
- Aluminium — selected when the item is in skin contact and needs to test clean
- Ceramic — the cost-effective default for volume programmes
- Rubber — selected when the item is in skin contact and needs to test clean
Processes available on this item
- Rotary Printing
- Mercerising
- Brushing
- Injection Moulding
- Embossing
- Die Casting

Where it is used
The specification above is the one most often ordered for Shirts. Related applications on the same base include swimwear, sleepwear, bras, caps, backpacks.
Quality and packing
- In-line inspection with AQL 1.5 sampling on every lot.
- Photo report shared before the balance payment is due.
- Packed to your own carton ratio and barcode specification.
- Test reports issued against California Prop 65 with the shipment.
- Golden sample retained at the factory, second one held by the buyer.
FAQ
How long does sampling take?
10 working days for the first sample, with 5 days per revision round. Plated or dyed-to-match items add a few days.
What are the payment and delivery terms?
Standard terms are a deposit with the order and the balance before shipment, under EXW / FOB / CIF / DDP as agreed.
Can you match a physical sample?
Yes. Send the reference and we reverse engineer the specification, then produce a counter sample for approval before any bulk commitment.
Which compliance documents do you provide?
California Prop 65 documentation is issued with the shipment. Test reports can be ordered against any additional standard you nominate.
Tell us the item, the quantity and the delivery window. We will quote it with the sub-processes named, so the lead time you approve is the lead time you get.




