Silk Fabric with Gunmetal Finish for Hats
This silk fabric is supplied to a written specification so that reorders match the approved sample. The fabric construction is fixed at quotation stage — base material, the gunmetal finish surface, the 160 gsm and the packing — and held on file, which is what keeps hats consistent across seasons instead of drifting with whatever the mill happens to have in stock.
The usual reason buyers come to us is not price. It is elastic that lost recovery after three washes, or a zipper puller that broke under pull test at the warehouse. Both are preventable once the specification is written down before bulk starts.

Specification
| Product | Silk Fabric |
|---|---|
| Finish / process | Gunmetal Finish |
| Typical application | Hats |
| Base material | Cotton |
| Standard size | 160 gsm |
| Colour matching | 24 Pantone or lab-dip matched shades |
| MOQ | 500 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Bulk lead time | 15-30 days after approval |
| Compliance | CPSIA |
Material and finish options
- Iron — selected when the item is in skin contact and needs to test clean
- Silicone — chosen where strength and wear resistance come first
- Nylon — selected when the item is in skin contact and needs to test clean
- PU Leather — used when the finish has to hold a plating or coating
- Polyester — selected when the item is in skin contact and needs to test clean
Processes available on this item
- Metal Stamping
- Embroidery
- Garment Washing
- Epoxy Coating
- Weaving
- Anti-Bacterial Finishing

Where it is used
The specification above is the one most often ordered for Hats. Related applications on the same base include lingerie, outdoor tents, blazers, underwear, scarves.
Quality and packing
- In-line inspection with AQL 1.5 sampling on every lot.
- Photo report shared before the balance payment is due.
- Packed to your own carton ratio and barcode specification.
- Test reports issued against CPSIA with the shipment.
- Golden sample retained at the factory, second one held by the buyer.
FAQ
What are the payment and delivery terms?
Standard terms are a deposit with the order and the balance before shipment, under EXW / FOB / CIF / DDP as agreed.
Do you hold stock for reorders?
Approved specifications are kept on file and, for repeat programmes, base material can be reserved against a rolling forecast.
Which compliance documents do you provide?
CPSIA documentation is issued with the shipment. Test reports can be ordered against any additional standard you nominate.
How long does sampling take?
10 working days for the first sample, with 5 days per revision round. Plated or dyed-to-match items add a few days.
If you are comparing suppliers, send us the spec they quoted against. We will quote the same spec and show you where the difference sits.



