Case Study: Custom Mesh Fabric for a Hotel Group in Czechia
Source:Rock Cascade Fountain /
Time:2026-09-18
Mesh Fabric for a Hotel Group in Czechia
A Hotel Group approached us with a mesh fabric requirement for the Czechia market. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive freight and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- A trim that passed sampling but failed in-line because it was never cycle tested
- A zipper puller that broke under pull test at the warehouse
- MOQ that was quoted per colourway rather than per style

What we specified
| Item | Mesh Fabric |
|---|---|
| Client type | A Hotel Group |
| Market | Czechia |
| Order volume | 2,000 pieces across 6 specifications |
| Base material | Nickel Silver |
| Standard size | 110 gsm |
| Finish | Powder Coating |
| Sampling rounds | 2 |
| Delivery window | 10 weeks from PO to ex-factory |
| Compliance | REACH SVHC Screening |
How it was resolved
- We rebuilt the specification around Nickel Silver and locked the tolerance before bulk.
- The finish was moved to Yarn-Dyed Finish after strike-off tests showed better durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and ratio specification.

Result
- 2,000 pieces delivered inside the 10-week window.
- Unit cost held within 1.5% of the original quotation.
- Inspection-related rejection stayed under 2.0%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Approve a pre-production sample made from the actual bulk base material. Substitute material behaves differently in finishing.
Planning something similar?
Share the programme details and we will propose two alternatives — one optimised for unit cost, one for lead time — and let you choose.