Case Study: Custom Aglet for a Hospital Procurement Team in Indonesia
Source:Artificial Grass Decor /
Time:2026-09-18
Aglet for a Hospital Procurement Team in Indonesia
A Hospital Procurement Team approached us with a aglet requirement for the Indonesia market. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive freight and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- Lead time quoted without the plating or dyeing sub-process
- Shade drift between the approved lab dip and the bulk lot
- Elastic that lost recovery after three washes

What we specified
| Item | Aglet |
|---|---|
| Client type | A Hospital Procurement Team |
| Market | Indonesia |
| Order volume | 100,000 pieces across 3 specifications |
| Base material | Zinc Alloy |
| Standard size | 8# Gauge |
| Finish | Glossy Enamel Coating |
| Sampling rounds | 2 |
| Delivery window | 6 weeks from PO to ex-factory |
| Compliance | WRAP |
How it was resolved
- We rebuilt the specification around Zinc Alloy and locked the tolerance before bulk.
- The finish was moved to Rainbow Iridescent Finish after strike-off tests showed better durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and ratio specification.

Result
- 100,000 pieces delivered inside the 6-week window.
- Unit cost held within 1.5% of the original quotation.
- Inspection-related rejection stayed under 1.0%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Keep one accountable owner on both sides. Most delays come from hand-offs, not from machines.
Planning something similar?
Tell us the item, the quantity and the delivery window. We will quote it with the sub-processes named, so the lead time you approve is the lead time you get.