Case Study: Custom Two-Way Separating Zipper for a Sportswear Brand in the United Arab Emirates
Source:Sports Championship Badges /
Time:2026-09-18
Two-Way Separating Zipper for a Sportswear Brand in the United Arab Emirates
A Sportswear Brand approached us with a two-way separating zipper requirement for the the United Arab Emirates market. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive freight and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- Lead time quoted without the plating or dyeing sub-process
- Elastic that lost recovery after three washes
- Shrinkage that only showed up after the first wash

What we specified
| Item | Two-Way Separating Zipper |
|---|---|
| Client type | A Sportswear Brand |
| Market | the United Arab Emirates |
| Order volume | 50,000 pieces across 2 specifications |
| Base material | Glass |
| Standard size | 50 mm Width |
| Finish | Enzyme Wash Finish |
| Sampling rounds | 4 |
| Delivery window | 6 weeks from PO to ex-factory |
| Compliance | GB 18401 |
How it was resolved
- We rebuilt the specification around Glass and locked the tolerance before bulk.
- The finish was moved to Chrome Plating after strike-off tests showed better durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and ratio specification.

Result
- 50,000 pieces delivered inside the 6-week window.
- Unit cost held within 1.5% of the original quotation.
- Inspection-related rejection stayed under 2.0%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Fix the specification count early. Adding variants after production starts is the most expensive change a client can request.
Planning something similar?
Share the programme details and we will propose two alternatives — one optimised for unit cost, one for lead time — and let you choose.