An Outdoor Gear Label approached us with a woven hang tag requirement for the the United Arab Emirates market. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive freight and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- A spec that lived in an email instead of a tech pack
- Lead time quoted without the plating or dyeing sub-process
- A trim that passed sampling but failed in-line because it was never cycle tested

What we specified
| Item | Woven Hang Tag |
|---|---|
| Client type | An Outdoor Gear Label |
| Market | the United Arab Emirates |
| Order volume | 20,000 pieces across 6 specifications |
| Base material | Nickel Silver |
| Standard size | 10# Gauge |
| Finish | Anodised Finish |
| Sampling rounds | 3 |
| Delivery window | 4 weeks from PO to ex-factory |
| Compliance | Bluesign |
How it was resolved
- We rebuilt the specification around Nickel Silver and locked the tolerance before bulk.
- The finish was moved to Soft-Touch Rubber Coating after strike-off tests showed better durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and ratio specification.

Result
- 20,000 pieces delivered inside the 4-week window.
- Unit cost held within 4.5% of the original quotation.
- Inspection-related rejection stayed under 1.0%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Keep one accountable owner on both sides. Most delays come from hand-offs, not from machines.