Case Study: Custom Cord End for a Footwear Factory in Taiwan
Source:Custom PP Stickers /
Time:2026-09-18
Cord End for a Footwear Factory in Taiwan
A Footwear Factory approached us with a cord end requirement for the Taiwan market. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive freight and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- Cartons packed to the factory ratio instead of the buyer's size ratio
- MOQ that was quoted per colourway rather than per style
- Reorders that quietly changed supplier and changed the hand feel

What we specified
| Item | Cord End |
|---|---|
| Client type | A Footwear Factory |
| Market | Taiwan |
| Order volume | 10,000 pieces across 4 specifications |
| Base material | TPU |
| Standard size | 5# Gauge |
| Finish | Silicone Wash Finish |
| Sampling rounds | 3 |
| Delivery window | 4 weeks from PO to ex-factory |
| Compliance | WRAP |
How it was resolved
- We rebuilt the specification around TPU and locked the tolerance before bulk.
- The finish was moved to Laser Engraved Finish after strike-off tests showed better durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and ratio specification.

Result
- 10,000 pieces delivered inside the 4-week window.
- Unit cost held within 3.0% of the original quotation.
- Inspection-related rejection stayed under 1.0%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Keep one accountable owner on both sides. Most delays come from hand-offs, not from machines.
Planning something similar?
Tell us the item, the quantity and the delivery window. We will quote it with the sub-processes named, so the lead time you approve is the lead time you get.