Case Study: Custom Moisture Wicking Fabric for a Bag and Luggage Maker in the United States
Moisture Wicking Fabric for a Bag and Luggage Maker in the United States
A Bag and Luggage Maker approached us with a moisture wicking fabric requirement for the the United States market. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive freight and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- Reorders that quietly changed supplier and changed the hand feel
- Cartons packed to the factory ratio instead of the buyer's size ratio
- An interlining that bubbled after the first press

What we specified
| Item | Moisture Wicking Fabric |
|---|---|
| Client type | A Bag and Luggage Maker |
| Market | the United States |
| Order volume | 100,000 pieces across 4 specifications |
| Base material | TPU |
| Standard size | 110 gsm |
| Finish | Brushed Silver Finish |
| Sampling rounds | 2 |
| Delivery window | 8 weeks from PO to ex-factory |
| Compliance | Sedex SMETA |
How it was resolved
- We rebuilt the specification around TPU and locked the tolerance before bulk.
- The finish was moved to Laser Engraved Finish after strike-off tests showed better durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and ratio specification.

Result
- 100,000 pieces delivered inside the 8-week window.
- Unit cost held within 3.0% of the original quotation.
- Inspection-related rejection stayed under 2.0%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Fix the specification count early. Adding variants after production starts is the most expensive change a client can request.
Planning something similar?
Tell us the item, the quantity and the delivery window. We will quote it with the sub-processes named, so the lead time you approve is the lead time you get.



