Case Study: Custom Polyester Spandex Fabric for a Supermarket Own-Brand Team in Finland
Source:Modern Taper Candle Holders /
Time:2026-09-18
Polyester Spandex Fabric for a Supermarket Own-Brand Team in Finland
A Supermarket Own-Brand Team approached us with a polyester spandex fabric requirement for the Finland market. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive freight and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- A spec that lived in an email instead of a tech pack
- Shade drift between the approved lab dip and the bulk lot
- A compliance document that arrived after the goods were already shipped

What we specified
| Item | Polyester Spandex Fabric |
|---|---|
| Client type | A Supermarket Own-Brand Team |
| Market | Finland |
| Order volume | 5,000 pieces across 3 specifications |
| Base material | ABS Resin |
| Standard size | 400 gsm |
| Finish | Pearlescent Coating |
| Sampling rounds | 3 |
| Delivery window | 8 weeks from PO to ex-factory |
| Compliance | Bluesign |
How it was resolved
- We rebuilt the specification around ABS Resin and locked the tolerance before bulk.
- The finish was moved to Glossy Enamel Coating after strike-off tests showed better durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and ratio specification.

Result
- 5,000 pieces delivered inside the 8-week window.
- Unit cost held within 1.5% of the original quotation.
- Inspection-related rejection stayed under 1.5%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Approve a pre-production sample made from the actual bulk base material. Substitute material behaves differently in finishing.
Planning something similar?
Share the programme details and we will propose two alternatives — one optimised for unit cost, one for lead time — and let you choose.



