Case Study: Custom Cashmere Fabric for a Denim Manufacturer in Brazil
Source:Stone Garden Fountain /
Time:2026-09-18
Cashmere Fabric for a Denim Manufacturer in Brazil
A Denim Manufacturer approached us with a cashmere fabric requirement for the Brazil market. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive freight and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- A spec that lived in an email instead of a tech pack
- Lead time quoted without the plating or dyeing sub-process
- A zipper puller that broke under pull test at the warehouse

What we specified
| Item | Cashmere Fabric |
|---|---|
| Client type | A Denim Manufacturer |
| Market | Brazil |
| Order volume | 20,000 pieces across 2 specifications |
| Base material | Ceramic |
| Standard size | 80 gsm |
| Finish | Brushed Silver Finish |
| Sampling rounds | 4 |
| Delivery window | 8 weeks from PO to ex-factory |
| Compliance | ISO 12947 Abrasion Resistance |
How it was resolved
- We rebuilt the specification around Ceramic and locked the tolerance before bulk.
- The finish was moved to Antique Brass Plating after strike-off tests showed better durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and ratio specification.

Result
- 20,000 pieces delivered inside the 8-week window.
- Unit cost held within 1.5% of the original quotation.
- Inspection-related rejection stayed under 2.0%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Keep one accountable owner on both sides. Most delays come from hand-offs, not from machines.