A Workwear Distributor approached us with a zipper slider requirement for the Canada market. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive freight and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- Lead time quoted without the plating or dyeing sub-process
- Shade drift between the approved lab dip and the bulk lot
- A zipper puller that broke under pull test at the warehouse

What we specified
| Item | Zipper Slider |
|---|---|
| Client type | A Workwear Distributor |
| Market | Canada |
| Order volume | 5,000 pieces across 4 specifications |
| Base material | Ceramic |
| Standard size | 6 mm Width |
| Finish | Rose Gold Plating |
| Sampling rounds | 2 |
| Delivery window | 6 weeks from PO to ex-factory |
| Compliance | ISO 9001 |
How it was resolved
- We rebuilt the specification around Ceramic and locked the tolerance before bulk.
- The finish was moved to Epoxy Doming after strike-off tests showed better durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and ratio specification.

Result
- 5,000 pieces delivered inside the 6-week window.
- Unit cost held within 2.0% of the original quotation.
- Inspection-related rejection stayed under 1.5%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Keep one accountable owner on both sides. Most delays come from hand-offs, not from machines.