Case Study: Custom Lobster Clasp for a Footwear Factory in Belgium
Source:Platinum Wedding Bands /
Time:2026-09-18
Lobster Clasp for a Footwear Factory in Belgium
A Footwear Factory approached us with a lobster clasp requirement for the Belgium market. The brief was specific: a defined look, a hard launch date and a unit cost that had to survive freight and duty. This case study records what was specified, what went wrong in sampling and how the bulk order was delivered.
The challenge
- Elastic that lost recovery after three washes
- MOQ that was quoted per colourway rather than per style
- Reorders that quietly changed supplier and changed the hand feel

What we specified
| Item | Lobster Clasp |
|---|---|
| Client type | A Footwear Factory |
| Market | Belgium |
| Order volume | 10,000 pieces across 2 specifications |
| Base material | Brass |
| Standard size | 10# Gauge |
| Finish | Silicone Wash Finish |
| Sampling rounds | 4 |
| Delivery window | 5 weeks from PO to ex-factory |
| Compliance | EN 71-3 |
How it was resolved
- We rebuilt the specification around Brass and locked the tolerance before bulk.
- The finish was moved to Anodised Finish after strike-off tests showed better durability.
- A pre-production sample was approved and retained as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and ratio specification.

Result
- 10,000 pieces delivered inside the 5-week window.
- Unit cost held within 2.0% of the original quotation.
- Inspection-related rejection stayed under 2.0%.
- The specification is now on file, so reorders reproduce the approved sample.
What we would repeat
Lock the material standard before sampling. Once the base changes, every downstream approval has to be redone and the calendar slips.
Planning something similar?
Share the programme details and we will propose two alternatives — one optimised for unit cost, one for lead time — and let you choose.